"We've got to have this thing built over here whatever it costs - We've got to have the bloody Union Jack on top of it."
The
competition to build the next generation of three new Royal Fleet Auxiliary
(RFA) support ships (known as the Fleet Solid Support / FSS) has become
increasingly politicised, with Jeremy Corbyn making a speech demanding that all
three vessels be built in the UK. Why has this situation emerged, why would UK
industry and MOD want to build overseas and what are the benefits for the UK in
doing so?
The FSS
project has its roots in the early 2000s, when the MOD began to look at options
to recapitalise its increasingly elderly RFA fleet into the 21st
Century. At the time the RFA operated four stores ships – two Fort I (AUSTIN
& ROSALIE) and two Fort II (GEORGE & VICTORIA) class, with subtly
different roles. This scheme was known as MARS and was intended to provide a
widespread replacement for the RFA flotilla.
The
original Fort class entered service in the late 1970s carrying dry stores /
ammunition to support either Carrier or Amphibious forces, while the Fort II’s
were originally envisaged as a mothership for a group of Type 23 ASW frigates,
when these were intended to be a highly austere vessel. Planned to be armed
with VLS Seawolf and facilities for servicing up to 5 helicopters, they
represented the pinnacle of cold war RFA designs. Post cold war both ships
tended to be used in support of carrier groups, or as command platforms in the
Middle East due to their size and excellent facilities.
The
2010 SDSR cut the RN aspiration to operate both a carrier and amphibious task
group in different locations and saw some MARS requirements merged in to
produce a total need for 3 dry stores ships in the RFA- enough to support the
combined requirements of the amphibious force (whose landing size had been
drastically scaled back), and the future planned carrier force that would
realistically see one deployed vessel (the other carrier originally being
planned to be in reserve or scrapped). This in practical terms saw the Fort I’s
primarily work to support amphibious forces, while FORT VICTORIA supported
carrier operations and then went to the Middle East. She is now being refitted for
work to support QEC as part of the Carrier Strike regeneration.
![]() |
Image by Ministry of Defence; © Crown copyright |
The
wider reduction in defence funding slowed the MARS project, and it wasn’t until
early this decade that four (rather than the six originally planned) Tide class
tankers were ordered. Since that point no progress has been made on ordering
the FSS, which seems stuck in Planning Round hell, unable to secure sufficient
funding to proceed into full construction.
The
situation today is that replacements are urgently needed for all three ships,
which are ageing and increasingly fragile. They are a key enabler of the
Carrier Strike capability, and in supporting the currently planned amphibious
forces too. A failure to bring replacements into service in a timely manner
will cause real risk to the delivery of Carrier Strike and the ongoing
credibility of the RN as a blue water navy in the next few years.
What is the issue?
The
reason this case has become so politically sensitive is due to emotionally
charged, and often highly misleading claims that these ships have been
‘promised’ to the Clyde shipyards, or that the MOD should order them via a UK
builder and not look for an overseas build.
The
problem is that it is not clear whether there is sufficient capacity in the UK
shipbuilding industry to build these vessels to the timelines required, while
also delivering the hugely ambitious shipbuilding programme for the next 15
years.
When
the TIDE class were ordered, despite multiple UK companies looking to bid, not
one proposed a UK build solution for the project. The reason was the lack of
space in UK shipyards to complete the ships and also finish all the work on
Type 45 and CVF while also beginning work for the Type 26 as well.
There
is a finite number of yards and workforce available in the UK at any one time
that can build large vessels, and when the TIDE order was competed, not one UK
company felt that it could complete the initial build in their own yards. For
all the bluster about building the TIDES in Korea, it is worth remembering that
these ships would have been built abroad, or not at all.
For the
FSS order the challenge is similar – there is a significant amount of
shipbuilding going on in the UK over the next 15 years that is going to require
a large amount of capacity to deliver. Between 2019 and 2034 the current plans
envisage the final delivery of both QEC class carriers, delivery of the
remaining Batch 2 RIVER class, the delivery of 8 Type 26 CITY class frigates
(which are substantial warships) and at least 5, potentially more, Type 31e
light frigates. Meanwhile the Submarine Service will also be delivering the
remaining ASTUTE class SSN’s and then the four DREADNOUGHT class SSBN’s too.
This massive construction effort will see the delivery of 7 submarines over the
next 15 years.
Work is
also likely to be needed on replacing the RN’s MCMV capability – most likely
through a combination of fewer hulls and a wide range of complex systems that
‘takes the man out of the minefield’. The Survey flotilla will also require
thinking about how they replace the capabilities offered by both SCOTT and the
E class hulls too, which will be 20-25 years old by 2022. Finally, there are a
plethora of patrol craft that will require replacement over the next few years
too (such as the ARCHER class).
Put
together this means there is a very substantial naval construction programme
underway for the Royal Navy for vessels that will be built in UK yards, by
British workers over the next 15 years.
What is the Strategy?
The MOD
has put a National Shipbuilding Strategy in place which makes abundantly clear
that warships will always be built in the UK. This strategy is designed to
ensure that there is a coherent flow of work for the shipyards which will keep
the right skills and capabilities present within the UK, and also preserve the
critical niche industries and areas where it is vital that sovereign capability
matters.
For the
UK, what really matters is less where a support ship is built, but more that
the vessel can be designed and maintained in the UK. Maintenance of a long-term
warship design capability is absolutely vital. Similarly, maintaining
sovereignty over things like communications, IT infrastructure and certain
electronic or other niche capabilities is equally important. These are the
areas which really matter for protection, the physical act of constructing a
supply ship is a nice to have, but not a critical ‘need to have’.
The UK
has long operated its RFA’s on a different model to other nations and does not
class them as warships – they are government operated vessels, but not warships.
This is actually an important point as it changes the rules by which the ships can
operate – particularly for prosaic issues like getting diplomatic clearance to
enter harbours, and where the ships can go.
In
practical terms this means RFA’s are also subject to subtly different
procurement rules from normal warships, and tenders for construction need to be
openly competed in line with EU rules. This does not automatically mean that
the work will go overseas, it simply means applying rules in the manner that
they are intended to work. Plenty of defence contracts are competed this way,
they just don’t have the same emotive draw of ship construction to gain wider
attention.
More
widely other shipbuilding contracts in the UK are also run this way – with many
component parts of the UK Government ordering vessels overseas as a result. For
instance, a major tender to replace a Scottish fisheries protection vessel
failed in the 200s because of a breach of EU procurement rules – these rules
have to be adhered to whilst the UK is still subject to them.
As we
look to the next 5-10 years, UK shipbuilding faces a bit of a bottleneck, with
a large amount of new designs entering service. This places pressure on shipyards
with finite resources, and on the supply chain too – a ship is not built in one
place, rather it is the putting together of thousands of parts from across many
different companies in one spot. In many ways shipbuilding is like making a LEGO
model – the parts are brought together in one spot and then turned into
something workable.
The challenge
for shipbuilders and their supply chain is to ensure that they can manage to successfully
deliver multiple designs into service at roughly the same time. The current
work package places a lot of pressure on many ‘pinch points’ including trained
staff and ensuring that the work can be delivered on time – particularly as the
RN is effectively looking to introduce 3 new classes of surface ship (T26, 31
and FSS) into service at roughly the same time.
While in
an ideal world all ships would be built at home, the cost may well be unsustainable,
as to meet the demand of mass introduction and construction programmes,
companies would need to temporarily expand (thus incurring additional costs) to
meet demand, but then reduce back in size again afterwards, when there is no
effective follow up work (to coin a political phrase, a very ‘boom and bust’ approach
to shipbuilding). In a time of real budget stretch, such a move may make
finishing three hulls unaffordable, and threaten the timely introduction to
service of desperately needed new capabilities.
Future Affordability?
The
wider long term picture is that even if the ships were built in the UK, there
is no follow on work to naturally replace the skills and industrial set up that
would make building them work out more cheaply – e.g. as soon as construction
was done on the third hull, work would begin on a new class using existing
resources.
A look
out to the RN’s ‘big ship’ replacement programme, even before the likely cuts
of the LPD force in the next defence review, indicates that no big replacement
programmes are planned realistically before the mid 2030s. There will be a need
then to replace potentially three LSD(A) and theoretically 2 LPD plus wrapping
up any residual LPH(R) requirements as well. It is also assumed here that ARGUS and DILIGENCE
will not be replaced directly, but by capability enhancements on other
platforms instead. This also assumes of course that the RN wants to remain in
the LPD/LSD game and not move to a different approach built around aviation and
not landing craft based manouvere…
Regardless
though, there is realistically a 5-10 year gap even in a best case budget
scenario where no large ships are likely to be under construction. Given the slippage
in ordering other big ship replacements, it is hard to see any new construction
beginning until the mid 2030s at the earliest, while FSS should deliver hulls
in the 2024-2025 timeframe. There is no requirement to follow on from them, meaning
that any ‘bulge’ in shipyard capacity and workers will need to be lost, causing
job losses and increasing the unit costs of all three ships.
Faced
with this, there is a strong argument to be made that to reduce pressure on the
UK chain, and be economically sustainable, companies may want to partner with
an overseas builder to produce a solution that sees the ship designed in the UK
(thus preserving this niche set of skills), built to a basic finish overseas (reducing pressure on the UK shipyards
and supply chain) and then completed in the UK (protecting the niche areas of
interest like communications and electronics).
More
widely it is difficult to reconcile the strong domestic opposition to seeing UK
designed ships built abroad as somehow being a ‘bad thing’ while at the same
time expecting other nations to come flocking to the UK to have their own ships
built. Modern defence exporting is a ‘give and take’ affair, where nations
spending money expect a significant level of investment back in return. The UK
showing its commitment to being a ‘fair player’ in the global market, and willing
to consider ordering overseas paradoxically strengthens the argument for
exports of the Type 26 and 31e design. It sends a message that the UK is prepared
to engage in a balanced manner when it comes to warship construction. In the
keenly competitive world of defence exporting, this counts for a great deal.
While a
UK build solution may provide a short term boost to jobs in one sector, it
would realistically be bad for the defence budget as a whole, increasing costs
and reducing the ability to spend money elsewhere on other UK capability instead.
For example, the cost increase associated with a UK build could potentially
have been instead used to protect and sustain lots of niche companies elsewhere
in the defence supply chain, ensuring their long term survival – the impact
being a loss of jobs and national capability elsewhere in order to safeguard an
already buoyant shipbuilding sector.
A final
thought is that the concept of what is really ‘British’ is often not well
defined in an era where sovereign production capabilities don’t really exist. Many
people bemoan the supposed loss of the UK aerospace industry as we apparently
no longer build aircraft at home, while conveniently ignoring that the UK has a
20% stake in every Joint Strike Fighter built, while also possessing one of the
worlds largest aerospace industries.
Defining
a defence capability as ‘British’ simply because it was assembled here is not
terribly helpful in a globalised world. Look at the component parts of a ship,
then try to work back through the supply chain to understand where they all
came from and how they fit together and you’ll quickly see how much defence
equipment components and sub components are built across the globe and slots together
as a final finished product here.
Is the
QUEEN ELIZABETH less British because many of her sub systems and components
were built abroad and then finished here? Are US Navy submarines somehow less
American because critical parts of their equipment are manufactured here in the
UK? Is Germany a less sovereign power due to the way that their Typhoon
fighters rely in part on equipment manufactured in Italy? In an incredibly interconnected
world, worrying about whether a product is British, just because part of its
build phase was overseas is frankly irrelevant.
What really
matters is the ability to design the ships, to know how they fit together and
then to bring it altogether into a finished product that can then be safely and
effectively operated globally – not worrying about whether the bare bones hull
was begun here on in Korea.
There
is much political anguish about this, but for all the demands that British
Government ships be built in Britain, particularly on the Clyde, but it is
worth remembering that in the late 2000s the Scottish Government oversaw the
Scottish Fishery Protection agency place a tender for OPVs to be built in
Poland and not Scotland. Memories are short at a time of political opportunity
but be in no doubt that all the main political parties in Government have ordered
foreign built vessels before for Government work.
It is
also perhaps ironic to see an Opposition party that increasingly defines itself
by opposition to the use of force under any circumstances, bar World War Two, demanding
that the UK build ships at home intended to support military operations and the
delivery of kinetic effect overseas. It is hard to reconcile the pacifistic
tendencies of the current Opposition to avoid any use of the armed forces with
any desire to see these ships used as designed or even enter service.
The
ultimate goal of the FSS is not to subsidise jobs for a few years in the
defence industry, but to deliver three hulls that can ensure the Royal Navy is
able to project carrier and amphibious power globally. It is easy to demand that
they are built in Britain, but to do so risks more jobs and capabilities in the
Defence sector, puts at risk the successful introduction to service of other
ship types and could jepoardise the successful implementation of the incredibly
bright shipbuilding programme that the Royal Navy has to look forward to over the
next 15 years – all so we can say ‘built in Britain’. Is this a price really
worth paying?
Great article, as always.
ReplyDeleteOne thing it raised was where do we place the limits of construction, for something to be defined as built in the UK? For example when a ship consists of modules built at different yards, how many of those modules need to be constructed in the UK for the ship to be UK built? Or is the assembly of them and fit out enough?
One point about the comment on the opposition. The British defence industry has made great play over the years about the number of jobs they maintain in the UK, indeed during Labour governments it is heightened, so it seems a little unfair to criticise the current opposition for demanding jobs are kept in the UK, even if they are opposed to the use of the resulting capabilities. This is a case of the PR from the defence manufacturers coming back to bite them.
ReplyDeleteUnfortunately the piss poor state of the Defence Budget has left us in this bind. Ideally the UK would have been able to maintain large ship building capability as well as escorts and submarines and these three vessells would have been a key part of that as well as an LPH. But we are where we are and certainly talking about building these vessels on the Clyde is nonsense given their size.
ReplyDeleteWhat should be highlighted is that people on the Clyde were promised 13 T26 and now it's 8 and after those 8 they can probably shut the doors.
"Built in the UK" is a bit of a red herring. What people actually mean is "money spent in the UK". The issue with FSS is that it has been the poor relation since about 2010 with all and sundry fixated on frigates and DD/FF numbers, which made it easy to reprofile funds and defer the project. Right up until the point when QNLZ left Rosyth and carrier Strike suddenly became very real to a lot more people.
ReplyDeleteWhether the ships can be built in the UK is heavily dependent on the outcome (if there is one) of the T31e. Put simply, the Clyde is out of the equation as it will be too busy with T26 to easily fit in a large ship - which could only be built at Govan anyway. Wee Jimmy K will wibble about Fergies, but the yard is about half the size required.
That leaves (realistically) one facility that could build the ships - Birkenhead and even then they'll struggle to do it efficiently as they have no panel line. The only suitable panel line in the country is on the Tyne, but the access and craneage to build big blocks in Hebburn is tricky. It's also worth pointing out that that facility hasn't built a ship since BP Achiever in the mid-80s. Rosyth has virtually no fabrication capability but of course people are distracted by the crane (which is largely irrelevant) - the majority of QEC blocks (in tonnage terms) were floated in from build elsewhere. H&W is similarly constrained, albeit with better fab sheds, but is still critically short of skilled manpower and hasn't built a ship since 2001. A risky choice.
So of that list, only Birkenhead is currently capable of building sizeable ships and is active in doing so. If CL win T31, they can't do FSS, which means that any other UK facility wanting to do this efficiently is going to have to invest big. One could put a big steel facility in at Rosyth for between £10-20M (there's enough room) which is nothing in terms of the overall programme budget, but as Sir H points out, what comes next?
If the NSBS had said that all UK government owned ships should be built in the UK, that would be a start, but unfortunately, it didn't. Which means that you end up waiting for the next UK warship order, which history proves does not end well.
The only realistic chance for FSS to be UK built is if CL lose T31 and even then they'll have to be sharp. Two Korean yards are both interested, as are some European ones.
As ever St Jezza of Islington is pontificating from his posterior with zero actual knowledge or understanding of what's involved. If we're really lucky, the Flabbot will be released to demonstrate how the economics could work, which would at least provide an element of comedy.....
Not supporting the Wee Jimmy Krankie comment, but there is a question here about whether Scottish Government support could have been used to expand the shipyards to build these types of ships. The difficulty of what comes later is mainly to do with people rather than capital if the money is a grant rather than a bank loan. On the people side, given the commonality between offshore construction and naval vessel build, at least for the fabrication part, there would seem to be a strong case for investment in training on ship building skills.
DeleteThis comment has been removed by the author.
ReplyDelete